|
Activity |
Unit |
Rate of Assistance |
|
Plantation Infrastructure and Development |
|
|
|
b. Small Nursery (1ha) Public Sector |
Nos |
15.00 |
|
c. Small Nursery (1ha) Private Sector |
Nos |
7.50 |
|
d. Upgrrading nursery infrastructure to meet accredaition norms in Public sector (1 ha) |
Nos |
2.50 |
|
e. Open Pollinated Crops (Public sector ) Vegetables. |
Ha |
0.35 |
|
f. Import of Plant Matreial |
P.B |
|
|
Area Expansion |
|
|
|
a. High Density Plantation (Apple/Mango/Litchi/Guava/Citrus) |
Ha |
0.30 |
|
Vegatables |
|
|
|
Hybrid Seeds |
Ha |
0.25 |
|
Flowers (for a maximum of 2 Hecatrs per Benificery) |
|
|
|
Cut Flowers (Small & Marginal Farmers) |
Ha |
0.50 |
|
Lose Flowers |
Ha |
0.20 |
|
Aromatic Flowers |
Ha |
|
|
Aromatic Plants |
|
|
|
Cost Aromatic Pant |
Ha |
0.50 |
|
Normal Spacing fruit plantation |
|
|
|
Without integration 60:20:20 |
Ha |
0.18 |
|
Incentive (1st year) |
Ha |
0.06 |
|
Incentive (2st year) |
Ha |
0.06 |
|
Rejuvenation/replacement of senile plantation,canopy mgt. |
Ha |
0.20 |
|
Creation of Water Sources |
|
|
|
a. Water harvesting system for individuals for storage of water in 20x20x3m,pond/tube wells/dug wells @ 100/ cum. |
Nos |
0.90 |
|
Protected Cultivation |
|
|
|
a. Fan and Pad System |
Sq.Mtr |
0.0094875 |
|
b. Tubular Structure(50% cost for a maximum area of 4000 sq.Mtr per beneficiary) |
Sq.Mtr
upto 500 |
0.006095 |
|
c. Wooden Structure (200 Sq. Mtr per benficiary) |
Sq.Mtr |
0.003105 |
|
d. Bamboo Structure(200 Sq. Mtr per benficiary) |
Sq.Mtr |
0.003000 |
|
e. Plastic Mulching( 50% of the total cost limited to 2 ha per beneficiary |
Ha |
0.184 |
|
Shade Net Houses |
|
|
|
a. Tubular Structure(50% cost for a maximum area of 4000 sq.Mtr per beneficiary) |
Sq.Mtr |
0.00408 |
|
b. Anti Bird/Anti hail nets(50% cost limited to 5000 sq.mtr per beneficiary) |
Sq.Mtr |
0.000175 |
|
Cost of planting material and cultivation of Carnation/Gerbera under poly house/shade net house.(50% of cost limited to 4000 sq.mtr per beneficiary) |
Sq.Mtr |
0.00305 |
|
Cost of planting material and cultivation of Rose and Lium under poly house/shade net house.(50% of cost limited to 4000 sq.mtr per beneficiary) |
Sq.Mtr |
0.00213 |
|
Promotion of Integrated Nutrient Management (INM) Integrated pest Management (IPM) |
|
|
|
a. Promotion of IPM/INM(30% of cost subject to a maximum of Rs.1200/ha limited to 4.00 ha /beneficiary |
Ha |
0.012 |
|
Organic farming |
|
|
|
Vermi Compost unit |
Nos |
0.50 |
|
HDPE Vermibeds |
Nos |
0.08 |
|
Bee Keeping |
|
|
|
Bee Colonies |
Nos |
0.008 |
|
Bee Hives |
Nos |
0.008 |
|
Honey Extractor |
Nos |
0.20 |
|
Centre of Excellence for Horticulture |
|
1000.00 |
|
Horticulture Mechanization |
|
|
|
a. Tractor upto 20 PTO HP |
Nos |
1.0 |
|
b. Power tiller below 8 BHP |
Nos |
0.50 |
|
c. Power Tiller (8 BHP and above) |
Nos |
0.75 |
|
d. Self Propelled Horticulture Machinery |
Nos |
1.25 |
|
e. (Powered Operated Taiwan Sprayer capacity more than 16 Litre) |
Nos |
0.10 |
|
Human Resource Development/Training of farmers |
|
|
|
a. Within State(Rs.1000/day per farmer including transport |
man days |
0.010 |
|
b. Outside State (Proejct based as per actual) 100% of cost |
P.B |
0 |
|
Exposure visit of Farmers |
|
|
|
a. Outside State (Proejct based as per actual) 100% of cost |
P.B |
0 |
|
Training of Technical Staff |
|
|
|
a. Within the state(Rs.300/- per day participant plus TA/DA as admissible (100% of the cost) |
Nos |
0.0130 |
|
b. Study tour to progressive States/units (group of minimum 5 particpants), Rs.800/- per day participant plus TA/DA as admissible (100% of the cost) |
Nos |
0.028 |
|
c. Outside India |
No |
6.00 |
|
Integrated Post Harvest Management |
|
|
|
a. Pack House |
Nos |
2.00 |
|
b. Integrated Pack House |
Nos |
25.00 |
|
c. Static and Mobile Vending Cart/Platform with cool chamber |
Nos |
0.15 |
|
d. Refrigerated Transport vehicle |
Nos |
13.00 |
|
e. Preservation Unit (Low Cost) |
Nos |
1.00 |
PMDP |
S.No |
Item |
Unit |
Rate of Assistance (Rs in Lac) |
1 |
Special Interventions |
Hects |
19.95 |
2 |
Plantation Infrastructure Dev. |
|
|
|
Accreditation/upgradation of Nursery infrastructure |
Nos |
10.00 |
3 |
Protected Cultivation |
|
|
|
i) Tubular Structure |
Sq.Mtr |
0.0061000 |
|
ii) Wooden Structure |
Sq.Mtr |
0.0031000 |
4 |
Horticulture Mechanization |
P.B |
|
5 |
Creation of Water Recources |
|
|
i |
Individual tube well/bore well |
Nos |
0.9 |
ii |
Tube well with distribution network |
Nos |
25.00 |
6 |
Integrated Post Harvest Management |
|
|
i |
Pack House |
Nos |
2.00 |
7 |
Establishment of Marketing Infrastructure for Horticulture Produce |
|
|
|
Whole Sale Markets |
No |
0 |
8 |
Establishment of New Gardens |
|
|
|
Vegetables (Hybrid) |
Ha |
0.25 |
9 |
Restoration of Damaged Horticulture Area due to 2014 floods |
|
|
i |
Pack House 2000 |
Nos |
2.00 |
ii |
Vermi Compost Unit 2000 |
Nos |
0.50 |
iii |
Marketing Infrastructure |
Nos |
|